ROLA: We're doubling our Wörgl-Trento services

Starting on 6th April, we’re ramping up our ROLA services on the Wörgl-Trento route. This will mean more trucks travelling by rail CO2-neutral over the Brenner Pass, which makes a significant contribution to relieving the burden of transit traffic in the vulnerable Alpine region.

As a reliable partner of the Province of Tyrol, we provide rapid, efficient and, above all, environmentally friendly shift to rail with the Rolling Road (ROLA). As a result of the Corona pandemic and the associated official restrictions, the Wörgl–Trento connection had to be greatly reduced and at times even completely stopped last year.

Now the ROLA to Italy is picking up speed again: starting on 6th April, the service on the Brenner route between Wörgl and Trento will be running again with one twinset a day. This means that six round trips are available for the transport industry on this route, which is double the current offer. What’s more, this offer can be expanded even further if there is sufficient demand.

Health and safety are paramount

We have extensive health and safety precautions in place in order to protect the truck drivers, our staff and everyone involved in the ROLA system to the greatest possible extent.

We monitor occupancy levels in the accompanying carriages to guarantee social distance on the trains and minimise the risk of infection. It is mandatory to wear FFP2 masks and increased health protection and disinfection measures are also in place. For example, the most important points of contact in the accompanying carriage such as toilet facilities, cabins, tables, and guiderails are disinfected every time the train turns around.

30.03.2021